Quantcast
Viewing all articles
Browse latest Browse all 681

A subprocess in the processing serer was forced to terminate. (RCIRAS0622)

Environment

BOEXIR2 SP2 FP 2.8

Reports:Desktop Intelligence in Adobe

 

We get this error in event viewer on all the servers where Deski Report Server, Deski Cache Servers and Job Servers are running in the eventlog while performing a load test on the BO Servers to test the concurrency.These reports would be run on demand and retrived in adobe and some reports are scheduled reports.

 

Some Scheduled jobs fail with TNS Connection timeout error.

 

Connection or SQL sentence error: (DA0005): [Exception: DBD, ORA-12170: TNS:Connect timeout occurred State: N/A] A connection required to refresh this document is unavailable. (DA0004): [] The following data providers have not been successfully refreshed: Evt Assessment Query. (DMA0007): []

When trying to run the reports in infoview individually it works fine.

 

In the eventviewer we see lot of errors related to BusinessObjects_fccache

 

**An error occurred while creating a subprocess in the processing server. (RCIRAS0604)**

 

We also see errors related to BusinessObjects_fcproc

 

Description:

A subprocess in the processing serer was forced to terminate. (RCIRAS0622)


Viewing all articles
Browse latest Browse all 681

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>